Odisha Power Generation Corporation (OPGC) Assistant Manager Recruitment 2022
Advertisement for the post of Assistant Manager in Odisha Power Generation Corporation (OPGC). Candidates are advised to read the details, and eligibility criteria mentioned below for this vacancy. Candidates must check their eligibility i.e. educational qualification, age limit, experience and etc. The eligible candidates can submit their application directly before 18th October 2022. Candidates can check the latest Odisha Power Generation Corporation (OPGC) Recruitment 2022 Assistant Manager Vacancy 2022 details and apply online at the www.opgc.co.in/ recruitment 2022 page.
Odisha Power Generation Corporation (OPGC) Recruitment Notification & Recruitment application form is available @ www.opgc.co.in/. Odisha Power Generation Corporation (OPGC) selection will be done on the basis of test/interview and shortlisted candidates will be appointed at Odisha. More details of www.opgc.co.in/ recruitment, new vacancy, upcoming notices, syllabus, answer key, merit list, selection list, admit card, result, upcoming notifications and etc. will be uploaded on the official website.
Number of Vacancy: 17 Posts
Educational Qualification:
O&M Department: Bachelor’s Degree in Engineering or Equivalent with minimum 60% marks. For SC, ST and PwBD candidates, the minimum required marks is 50%.
SAP & IT Department: Bachelor’s Degree in Engineering or MBA (Material Management) with minimum 60% marks. For SC, ST and PwBD candidates, the minimum required marks is 50%.
Legal Department: 5 years integrated BA LLB/LLB from reputed institute with minimum CGPA 6.0. For SC, ST and PwBD candidates, the minimum required CGPA is 5.5.
Pay Scale:
INR
As Per Rules Per Month
Age Limit: Maximum 41 Years.
Selection Procedure:
1. The assessment of short-listed candidates applied against any post, will be made through Personal Interview only. Mere qualifying as per the qualification criteria described above does not give a right for shortlisting for the interview.
2. The candidates will be selected based on the performance in Personal Interview, organizational requirement and vacancies to be operated.
3. In the event of large number of short-listed candidates, the Management reserves the right to raise the minimum eligibility standards/criteria by taking into account the qualification and/or experience to restrict the number of candidates for assessment/Personal Interview.
Application Fee: Not Specified.
The candidates need to apply online in the career section of OPGC website (www.opgc.co.in) from 11.00 AM of 28-09-2022 to 06.00 PM of 18-10-2022. The candidate should click on the online application link, read the instructions carefully and fillin the online application form giving accurate information. If the online application is not successfully completed, candidate is required to register again. Applications received through any other mode would not be accepted and summarily rejected.
Published on: 30th September 2022
For more details, please refer to official notification at Download Official Notification
| Job Details | Closing Date |
|---|---|
|
Assistant Manager, Deputy Manager
( 35 Posts) Posts • Chandrasekharpur, Bhubaneswar
|
17th August 2025 |
Odisha Power Generation Corporation Ltd. (OPGC) is a Government Company of the State of Odisha. It operates state of the art thermal power plants at Banharpalli, Jharsuguda. It has a total generation capacity of 1740 MW (2x210 MW in first phase and 2x660MW in second phase). Incorporated on November 14, 1984, OPGC started as a wholly owned Government Company of the State of Odisha with the main objective of establishing, operating & maintaining large Thermal power generating stations.
In the pursuit of its objective, OPGC established IB Thermal Power Station having two units of 210 MW each in the Ib valley area of Jharsuguda District in the State of Odisha in the first phase. These Units became operational in 1994 (1st Unit) and 1996 (2nd Unit) respectively. The entire generation from these units are committed to Gridco – the state owned Power Transmission & Trading Company on the basis of a long-term power purchase agreement.
Two more units (Unit 3 & 4) having capacity of 660 MW each were added in the second phase in the year 2019 which added a capacity of 1320 MW to the earlier existing 420 MW to IB Thermal Power Station.
As a part of the reform in the energy sector of the state, 49% of the equity was divested in favour of a Private investor ( American Company) i.e. AES Corporation, USA in early 1999. After exit of AES in December 2020, Govt. of Odisha (GoO) acquired the 49% equity held by AES through another subsidiary of GoO Odisha Hydro Power Corporation Ltd. (OHPC). Thus OPGC became a fully owned company of the Government of Odisha w.e.f. 10th December 2020.