Govt Metro Railway Kolkata Jobs 2025 - Sarkari Naukri
| X | Youtube |
Metro Railway, Kolkata Recruitment for following posts:
List of active jobs at Metro Railway, Kolkata. The other Related Jobs Metro Railway, Kolkata Recruitment Notification
Act Apprentice ( 128 Posts)
View Job DetailsLast Date for application: 22nd January 2026
Job Location: JL Nehru Road, Kolkata
Pay Scale: INR21500-90000
Expired Jobs
List of old jobs.
| Job Title / Posts | Last Date |
|---|---|
| Group-C - ( 02 Posts) Posts
33/1 J L Nehru Road, Kolkata |
Last Date: 31st January 2025 |
| Act Apprentice - ( 128 Posts) Posts
JL Nehru Road, Kolkata |
Last Date: 22nd January 2025 |
About Metro Railway, Kolkata Recruitment
About Metro Railway, Kolkata
Metro Railway, Kolkata is the first underground Metro in India. It extends from Dakshineswar to Kavi Subhash Metro station near Garia, on the busy North-South axis of Kolkata over a length of 31.365 Kms. with 26 Stations & 15.70 Kms. of underground section. Based on traffic studies, the Dum Dum – Tollygunge corridor was first selected for implementation and work started on 29th December, 1972. The first metro line in India was completed on 24th October 1984, a stretch of about 3.4 km between Esplanade and Bhowanipur (Netaji Bhavan), thrown open for the Public. The Metro Railway, Kolkata was constructed progressively from 1972 to 2021. In Phase-I, a length of 16.45 Kms from Dum Dum to Tollygunge (Mahanayak Uttam Kumar) completed in 1995 and in Phase-II a length of 5.834 Kms from Mahanayak Uttam Kumar to Kavi Nazrul Metro station is completed in August, 2009. In October 2010, Metro services further extended upto Kavi Subhash, a length of 2.851 Kms. It is further extended Dum Dum to Noapara, a length of 2.091 Kms, on 10th July 2013. The last leg was opened on 23rd February 2021 for commercial operation from Noapara to Dakshineswar (4.139 Kms). It extended in East-West axis from Salt Lake Sector-V to Salt Lake Stadium, covering a length of 5.3 kms with 6 stations on 13th February 2020 and further extended from Salt Lake Stadium to Phoolbagan on 4th October 2020 (1.67 kms).
It is further extended from Phoolbagan to Sealdah (2.33 kms) on 11th July 2022. From Joka to Taratala (6.5 km) inaugurated on 30.12.2022 and thrown open for public on 02.01.2023 in JOKA-ESPLANADE section (Purple Line). Extension in Purple Line from Taratala to Majherhat (1.25 km); in Kavi Subhash - Airport section (Orange Line) from Kavi Subhash to Hemanta Mukhopadhyay (5.4 km) and in Green Line Howrah Maidan to Esplanade (4.8 km) was inaugurated on 06.03.2024 and thrown open for public on 15.03.2024. Extension in Orange Line from Hemanta Mukhopadhyay to Beleghata (4.39 km); in Green Line from Esplanade to Sealdah (2.45 km) and a new Yellow Line from Noapara to Jai Hind Bimanbandar (6.77 km) was inaugurated on 22.08.2025.
Metro Railway Kolkata is part of Indian Railways, covers a length of 25.135 kms over the busy North-South axis of Kolkata.
Recent Jobs
- Pawan Hans Ltd Invites Application for 21 Assistant Manager and Various Posts
- Raman Research Institute (RRI) Invites Application for Scientist Recruitment 2025
- Raman Research Institute (RRI) Invites Application for Librarian Recruitment 2025
- VAMNICOM Invites Application for 11 Faculty and Administrative Positions Recruitment 2025
- Engineers India Limited (EIL) Invites Application for Chief General Manager Recruitment 2025
- Botanical Survey of India (BSI) Invites Application for 25 Project Assistant and Various Posts
- Ministry of Defence (MoD) Invites Application for 4 Deputy Divisional Fire Officer Recruitment 2025
- Kamdhenu University Invites Application for 67 Teaching Posts Recruitment 2025
- Sainik School Korukonda Invites Application for Lab Assistant Recruitment 2025
- National Bureau of Plant Genetic Resources Invites Application for Project Scientist Recruitment 2025
- AIIPMR Invites Application for Bio-Medical Engineer Recruitment 2025
- Tata Institute Of Fundamental Research Invites Application for Work Assistant and Various Posts
