Vacancy Circular No:
Heavy Water Plant Hospital Manuguru (HWB)
invites applications for recruitment of Scientific Assistant /B
Number of Vacancy: 1 Posts
| Heavy Water Plant Hospital Manuguru Job Notification 2022 For Scientific Assistant /B Post - 30000 Salary - Check Recruitment Details Recruitment 2022 | Details |
|---|---|
| Job Role | Scientific Assistant /B |
| Education Requirement | B.Sc,Diploma |
| Total Vacancy | 1 Post |
| Job Locations | Bhadradri Kothagudem |
| Experience | 3 - 7 years |
| Salary | 30000(Per Month) |
| Posted on | 21 Jan, 2022 |
| Walkin Date | 10 Feb, 2022 |
Educational Qualification: B.Sc, Diploma
Heavy Water Plant (Manuguru) Hospital located at Gautaminagar, HWPM Colony Aswapuram, Bhadradri Kothagudem Distict, Telangana is catering to the medical needs of the employees of Heavy Water Plant (Manuguru). The hospital requires to fill a post of Scientfic Assistant / B (Radiologist) purely on LoCum Adhoc (Temporary) Basis for a period of 89 days and can be extended upto 6 months.
1. Post Name: Scientific Assistant/ B
2. Qualifications and Experience: B.Sc (Radiography) with minimum 60% marks or B.Sc. with min. 50% marks+ 1 (One) year Diploma in Radiography and having experience of 3 yrs. in the last 5 or 7 yrs.
3. Monthly Emoluments: Rs. 30,000/- per month (fixed) plus residential accommo- dation on normal licence fee.
Pay Scale:
INR
30000(Per Month)
Age Limit:As Per Rules Age
Selection Will be Based either Written Exam/Interview
1. Interested candidates may attend the walk-in-interview at HWP(M) Hospital, HWP(M) Colony, Gautami Nagar, Aswapuram, Bhadradri Kothagudem District Telangana along with one set of true copies attested by a Gazetted Officer as well as Original certificates of date of birth, educational qualifications, one passport size self photograph and experience.
2. Walk-in-interview On 10/02/2022 at 10:30 Hours
3. Candidates are advised to report at 10:00 hrs. Candidates arriving after 12:00 hrs will not be entertained.
Advertisement No. HWPM/1/2022
Published on: 21 January 2022
For more details, please refer to official notification at Download Official Notification
Heavy Water Board (HWB), a constituent unit under Department of Atomic Energy, is primarily responsible for production of Heavy Water (D2O) which is used as a 'moderator' and 'Coolant' in the nuclear power as well as research reactors.