Vacancy Circular No:
Konkan Railway
invites applications for recruitment of Chief Electrical Engineer
Number of Vacancy: 1 Posts
| Konkan Railway Announced Job Notification For Chief Electrical Engineer Vacancies - Apply Soon Recruitment 2022 | Details |
|---|---|
| Job Role | Chief Electrical Engineer |
| Education Requirement | |
| Total Vacancy | 1 Post |
| Job Locations | Navi Mumbai |
| Age Limit | Below 55 years as on date of notification |
| Experience | 16 - 22 years |
| Salary | Not Disclosed |
| Posted on | 03 Mar, 2022 |
| Last Date To Apply | 24 Mar, 2022 |
Educational Qualification: N/A
Sub:- Notification for the post of Chief Electrical Engineer(CEE) on Deputation basis at Corporate Office, Belapur.
Ref- Railway Board's circular dated 07.03.2018.
1. Post Name: Chief Electrical Engineer (CEE)
2. NO of Post: One (1) post
3. Location: CO/Belapur
4. Term of Appointment: Deputation Basis
5. Scale Of Pay: SAG/IRSEE, in 7th CPC Pay Matrix Level-14
6. Pay and Allowancees:In parent Railways pay plus deputation allowance
7. Eligibility: Officers having at SAG/NFSAG/SG IRSEE least 16 years of Group 'A service. OR Officer of Electrical wing of Railway PSU Presently working in IDA Scale level E-8 or working in level E-7 for at least 5 years.
8. Job description:- Having Experience in all or some of following activities maintenance/construction of TRD, Electrical General Services, Train Lighting. Electrical Locomotive Maintenance etc. TRD
9. Perks and Benefits : The officer will draw pay which would have been admissible to him/her from time to time on the Railways plus deputation (duty) allowance.
10. Deputation and Term of Deputation : Minimum 3 years normal term of deputation.
Pay Scale:
INR
Not Disclosed
Age Limit: Below 55 years as on date of notification
Selection will be Based on Deputation
1. Closing Date : :30 days from date of issue. (24/03/2022)
2.Web Address :www.konkanrailway.com
Published on: 03 March 2022
For more details, please refer to official notification at Download Official Notification
The Konkan Railway was the missing link between India’s commercial capital, Mumbai, and Mangalore. The 741-kilometre line connects Maharashtra, Goa and Karnataka States — a region of criss-crossing rivers, plunging valleys and mountains that soar into the clouds.
The Konkan is a coastal strip of land bounded by the Sahyadri hills on the east, and Arabian Sea on the west. It is a land where mythology breathes side by side with economic growth,a land with rich mineral resources, dense forest cover and a landscape fringed with paddy, coconut and mango trees. The formidable terrain to be conquered and the short construction period meant that the project could only be completed with the help of several technological innovations. Apart from setting a trend for other infrastructure projects in the country, the Konkan Railway provides concrete proof of the skills of Indian engineers, their discipline, team spirit and courage. But it is also a tribute to the unconquerable human spirit. Beyond the technical jargon, it was a leap of faith that made the long cherished dream of the people of the region possible.