Metro Railway, Kolkata Sports Quota Recruitment 2023: Advertisement for the post of Sports Quota in Metro Railway, Kolkata. Candidates are advised to read the details, and eligibility criteria mentioned below for this vacancy. Candidates must check their eligibility i.e. educational qualification, age limit, experience and etc. The eligible candidates can submit their application directly before 28 February 2023. Candidates can check the latest Metro Railway, Kolkata Recruitment 2023 Sports Quota Vacancy 2023 details and apply online at the www.mtp.indianrailways.gov.in/ recruitment 2023 page.
Metro Railway, Kolkata Recruitment Notification & Recruitment application form is available @ www.mtp.indianrailways.gov.in/. Metro Railway, Kolkata selection will be done on the basis of test/interview and shortlisted candidates will be appointed at West Bengal. More details of www.mtp.indianrailways.gov.in/ recruitment, new vacancy, upcoming notices, syllabus, answer key, merit list, selection list, admit card, result, upcoming notifications and etc. will be uploaded on the official website.
Vacancy Circular No:
Metro Railway Kolkata
invites applications for recruitment of Sports Quota
-, Kolkata, - West Bengal
Number of Vacancy: Various Posts
| Metro Railway Kolkata Recruitment 2023 | Details |
|---|---|
| Company | Metro Railway, Kolkata |
| Job Role | Sports Quota |
| Education Requirement | Any Graduate |
| Total Vacancy | Various Post |
| Job Locations | Kolkata |
| Experience | Fresher |
| Salary | Not Disclosed |
| Posted on | 24 Feb, 2023 |
| Last Date To Apply | 28-02-2023 |
Educational Qualification:
(1) Minimum 10th class & ITI pass or 12th class passed as required for the appropriate post in Level 2/3.
(2) Minimum Degree from a recognized University or its equivalent as required for the appropriate post in Level 5 / 4.
Experience: Please refer to official document
Pay Scale:
INR
Not Disclosed
Age Limit: 18-25 Years.
Candidates will be selected based on written test/personal interview/medical test/walkin interview. Once a candidate is selected they will be placed as Sports Quota in Metro Railway Kolkata.
Published on: 24 February 2023
For more details, please refer to official notification at Download Official Notification
| Job Name | Location | Last Date | Details |
|---|---|---|---|
|
Act Apprentice ( 128 Posts)
INR21500-90000
|
JL Nehru Road, Kolkata | 22nd January 2026 | View Details |
| Job Details | Closing Date |
|---|---|
|
Group-C
( 02 Posts) Posts • 33/1 J L Nehru Road, Kolkata
|
31st January 2025 |
|
Act Apprentice
( 128 Posts) Posts • JL Nehru Road, Kolkata
|
22nd January 2025 |
Metro Railway, Kolkata is the first underground Metro in India. It extends from Dakshineswar to Kavi Subhash Metro station near Garia, on the busy North-South axis of Kolkata over a length of 31.365 Kms. with 26 Stations & 15.70 Kms. of underground section. Based on traffic studies, the Dum Dum – Tollygunge corridor was first selected for implementation and work started on 29th December, 1972. The first metro line in India was completed on 24th October 1984, a stretch of about 3.4 km between Esplanade and Bhowanipur (Netaji Bhavan), thrown open for the Public. The Metro Railway, Kolkata was constructed progressively from 1972 to 2021. In Phase-I, a length of 16.45 Kms from Dum Dum to Tollygunge (Mahanayak Uttam Kumar) completed in 1995 and in Phase-II a length of 5.834 Kms from Mahanayak Uttam Kumar to Kavi Nazrul Metro station is completed in August, 2009. In October 2010, Metro services further extended upto Kavi Subhash, a length of 2.851 Kms. It is further extended Dum Dum to Noapara, a length of 2.091 Kms, on 10th July 2013. The last leg was opened on 23rd February 2021 for commercial operation from Noapara to Dakshineswar (4.139 Kms). It extended in East-West axis from Salt Lake Sector-V to Salt Lake Stadium, covering a length of 5.3 kms with 6 stations on 13th February 2020 and further extended from Salt Lake Stadium to Phoolbagan on 4th October 2020 (1.67 kms).
It is further extended from Phoolbagan to Sealdah (2.33 kms) on 11th July 2022. From Joka to Taratala (6.5 km) inaugurated on 30.12.2022 and thrown open for public on 02.01.2023 in JOKA-ESPLANADE section (Purple Line). Extension in Purple Line from Taratala to Majherhat (1.25 km); in Kavi Subhash - Airport section (Orange Line) from Kavi Subhash to Hemanta Mukhopadhyay (5.4 km) and in Green Line Howrah Maidan to Esplanade (4.8 km) was inaugurated on 06.03.2024 and thrown open for public on 15.03.2024. Extension in Orange Line from Hemanta Mukhopadhyay to Beleghata (4.39 km); in Green Line from Esplanade to Sealdah (2.45 km) and a new Yellow Line from Noapara to Jai Hind Bimanbandar (6.77 km) was inaugurated on 22.08.2025.