Vacancy Circular No:
Metro Railway Kolkata
invites applications for recruitment of Part Time Dental Surgeon
Number of Vacancy: 1 Posts
| Metro Railway Kolkata Recruitment 2022 Recruitment 2022 | Details |
|---|---|
| Job Role | Part Time Dental Surgeon |
| Education Requirement | |
| Total Vacancy | 1 Post |
| Job Locations | Kolkata |
| Age Limit | Not exceeding 53 years |
| Experience | 3 - 5 years |
| Salary | 36900(Per Month) |
| Posted on | 04 Apr, 2022 |
| Walkin Date | 05 Apr, 2022 |
Educational Qualification: BDS
Dental Surgeons who satisfy the requisite qualification and age willing for such engagement are requested to report with all certificates and testimonials for walk-in-interview at the venue and time mentioned below:
1. Post Name: Contractual Part Time Dental Surgeon
2. Category: Part-Time Dental Surgeon, 4 hours daily (six days in a week)
3. No of Post: 01
4. Pay/ Emoluments: Rs.36900/- p.m. fixed.
5. Requisite Qualification: BDS, Valid registration certificate State Medical of any Council/Dental Council. Three years working experience.
Pay Scale:
INR
36900(Per Month)
Age Limit: Not exceeding 53 years
Selection Will be Based either Written Exam/Interview
1. While attending the interview, candidates are requested to bring all certificates, Voter Card, PAN Card, Aadhaar Card in Original as well as self attested copies of the same in support of age, qualifications, medical registration number, experience etc. and all Mark Sheets of BDS degree along with 2 passport size Photographs.
2. Venue of Walk-in-Interview: Office of the Pr.Chief Medical Officer, Tapan Sinha Memorial Hospital, Metro Railway, 28/55, M.N.Sen Road, Chanditala, Kolkata- 700040.
3. Reporting Time: 10.00 hours to 11.00 hours
4. Date of Walk- in-Interview: 05/04/2022
Published on: 04 April 2022
For more details, please refer to official notification at Download Official Notification
| Job Name | Location | Last Date | Details |
|---|---|---|---|
|
Act Apprentice ( 128 Posts)
INR21500-90000
|
JL Nehru Road, Kolkata | 22nd January 2026 | View Details |
| Job Details | Closing Date |
|---|---|
|
Group-C
( 02 Posts) Posts • 33/1 J L Nehru Road, Kolkata
|
31st January 2025 |
|
Act Apprentice
( 128 Posts) Posts • JL Nehru Road, Kolkata
|
22nd January 2025 |
Metro Railway, Kolkata is the first underground Metro in India. It extends from Dakshineswar to Kavi Subhash Metro station near Garia, on the busy North-South axis of Kolkata over a length of 31.365 Kms. with 26 Stations & 15.70 Kms. of underground section. Based on traffic studies, the Dum Dum – Tollygunge corridor was first selected for implementation and work started on 29th December, 1972. The first metro line in India was completed on 24th October 1984, a stretch of about 3.4 km between Esplanade and Bhowanipur (Netaji Bhavan), thrown open for the Public. The Metro Railway, Kolkata was constructed progressively from 1972 to 2021. In Phase-I, a length of 16.45 Kms from Dum Dum to Tollygunge (Mahanayak Uttam Kumar) completed in 1995 and in Phase-II a length of 5.834 Kms from Mahanayak Uttam Kumar to Kavi Nazrul Metro station is completed in August, 2009. In October 2010, Metro services further extended upto Kavi Subhash, a length of 2.851 Kms. It is further extended Dum Dum to Noapara, a length of 2.091 Kms, on 10th July 2013. The last leg was opened on 23rd February 2021 for commercial operation from Noapara to Dakshineswar (4.139 Kms). It extended in East-West axis from Salt Lake Sector-V to Salt Lake Stadium, covering a length of 5.3 kms with 6 stations on 13th February 2020 and further extended from Salt Lake Stadium to Phoolbagan on 4th October 2020 (1.67 kms).
It is further extended from Phoolbagan to Sealdah (2.33 kms) on 11th July 2022. From Joka to Taratala (6.5 km) inaugurated on 30.12.2022 and thrown open for public on 02.01.2023 in JOKA-ESPLANADE section (Purple Line). Extension in Purple Line from Taratala to Majherhat (1.25 km); in Kavi Subhash - Airport section (Orange Line) from Kavi Subhash to Hemanta Mukhopadhyay (5.4 km) and in Green Line Howrah Maidan to Esplanade (4.8 km) was inaugurated on 06.03.2024 and thrown open for public on 15.03.2024. Extension in Orange Line from Hemanta Mukhopadhyay to Beleghata (4.39 km); in Green Line from Esplanade to Sealdah (2.45 km) and a new Yellow Line from Noapara to Jai Hind Bimanbandar (6.77 km) was inaugurated on 22.08.2025.