Vacancy Circular No:
Konkan Railway Corporation Limited (KRCL)
invites applications for recruitment of Protocol Assistant
-, Jammu, - Jammu & Kashmir
Number of Vacancy: 1 Posts
| Konkan Railway Vacancy 2022 Recruitment 2022 | Details |
|---|---|
| Job Role | Protocol Assistant |
| Education Requirement | |
| Total Vacancy | 1 Post |
| Job Locations | Jammu |
| Experience | 5 - 25 years |
| Salary | 30000(Per Month) |
| Posted on | 23 Mar, 2022 |
| Walkin Date | 19 Apr, 2022 |
Educational Qualification: Retired Staff
Experience: Please refer to official document
Konkan Railway Corporation Limited (KRCL) is a Public Sector Undertaking under the Ministry of Railways having its Corporate Office at CBD Belapur, Navi Mumbai and Project Head Office at Satyam Complex, Marble Market, Extension- Trikuta Nagar, Jammu, Jammu & Kashmir (U.T). KRCL invites applications for the following fixed term contract post on fixed remuneration basis for USBRL Project to be operated in the Jammu and Kashmir (U.T). 1. Name of the Post: Protocol Assistant 2. No. of Post: 01 3. Fixed Remuneration (In Rupees): 30,000/- per month 4. Eligibility, Experience & Desirable: a) Eligibility: Employees retired from Central / State Govt. / PSUs. b) Experience: Minimum five years’ experience in the field of Protocol duties in Central / State Govt. / PSUs. c) Desirable: Preference will be given to candidate having experience / knowledge in the field of Protocol duties especially in Railways / Central Govt. / CPSUs.
Pay Scale:
INR
30000(Per Month)
Age Limit: As Per Rules
1. The candidates shall arrive on time at the venue and get registered with the nominated KRCL official for the walk-in-interview as indicated.
2. The candidates will be interviewed by a nominated Committee and the selection will be finalized on merit based on the performance in the interview, qualification etc. All the eligible candidates will be first interviewed by a nominated Committee and the shortlist panel will be prepared. The shortlisted candidates who are found suitable will be engaged subject to found suitable in the prescribed Medical Examination.
3. The decision of the Nominated Committee will be final and binding.
1. Protocol Assistant on Contract Basis - 19/04/2022 reporting time @09:00 to 13.00hrs
2. Place: - USBRL Project Head Office, Konkan Railway Corporation Ltd., Satyam Complex, Marble Market, Extension-Trikuta Nagar, Jammu, Jammu & Kashmir (U.T). PIN- 180011.
3. Candidates should see the eligibility criteria and application format on the KRCL website www.konkanrailway.com at the link Recruitment - Current Notification. Candidates should report directly for walk in interview along with one copy of application, prepared in the prescribed format as given at the above link. Candidates should come for Walk-in-Interview along with original certificates (age proof, qualification, experience, etc.) and one set of attested copy of the same.
Published on: 23 March 2022
For more details, please refer to official notification at Download Official Notification
| Job Details | Closing Date |
|---|---|
|
Assistant Engineer
( 01 Posts) Posts • Seawoods (West), Navi Mumbai
|
6th January 2026 |
|
Junior Technical Assistant and Various Posts
( 04 Posts) Posts • CBD Belapur, Navi Mumbai
|
12th December 2025 |
|
Technician
( 27 Posts) Posts • Seawoods (West), Navi Mumbai
|
26th September 2025 |
|
Assistant Engineer and Various Posts
( 16 Posts) Posts • CBD Belapur, Navi Mumbai
|
30th September 2025 |
|
Senior Project Manager (S&T)
( 05 Posts) Posts • CBD Belapur, Navi Mumbai
|
25th September 2025 |
|
Technical Assistant, Assistant Electrical Engineer
( 80 Posts) Posts • CBD Belapur, Navi Mumbai
|
18th September 2025 |
|
Design Engineer and Various Posts
( 13 Posts) Posts • 7-Tolstoy Marg, New Delhi
|
21st August 2025 |
|
Deputy Chief Electrical Engineer
( 02 Posts) Posts • CBD Belapur, Navi Mumbai
|
9th August 2025 |
|
Junior Technical Associate (JTA) (Signal/Telecommunication), Technician (Signal/Telecommunication)
( 28 Posts) Posts • Post Granmorh, Reasi
|
7th August 2025 |
|
Senior Regional Mechanical Engineer
( 01 Posts) Posts • Margao, South Goa
|
21st June 2025 |
|
Chief Personnel Officer (CPO)
( 01 Posts) Posts • CBD Belapur, Navi Mumbai
|
20th March 2025 |
|
Deputy Chief Electrical Engineer
( 01 Posts) Posts • CBD Belapur, Navi Mumbai
|
5th February 2025 |
The Konkan Railway was the missing link between India’s commercial capital, Mumbai, and Mangalore. The 741-kilometre line connects Maharashtra, Goa and Karnataka States — a region of criss-crossing rivers, plunging valleys and mountains that soar into the clouds.
The Konkan is a coastal strip of land bounded by the Sahyadri hills on the east, and Arabian Sea on the west. It is a land where mythology breathes side by side with economic growth,a land with rich mineral resources, dense forest cover and a landscape fringed with paddy, coconut and mango trees. The formidable terrain to be conquered and the short construction period meant that the project could only be completed with the help of several technological innovations. Apart from setting a trend for other infrastructure projects in the country, the Konkan Railway provides concrete proof of the skills of Indian engineers, their discipline, team spirit and courage. But it is also a tribute to the unconquerable human spirit. Beyond the technical jargon, it was a leap of faith that made the long cherished dream of the people of the region possible.
The Konkan Railway has also in a way changed the lives of the Engineers and otherpeople associated with the project. For them it was the glory of overcoming all odds, and the satisfaction and pride that they have built something for posterity.
The completion of the Konkan Railway was a “tryst with destiny” for many people in the Konkan region, redeemed in the 50th year of the nation’s Independence. It is hence entirely fitting that the first train on the completed track was flagged off on January 26, 1998, Republic Day.