Konkan Railway Corporation Limited (KRCL) Invites Application for 28 Junior Technical Associate, Technician Recruitment 2025

Konkan Railway Corporation Limited Reasi Last Date: 7th August, 2025

Vacancy Circular No: CO/P-R/3C/2025

Konkan Railway Corporation Limited (KRCL) Junior Technical Associate (JTA) (Signal/Telecommunication), Technician (Signal/Telecommunication) Recruitment 2025. Advertisement for the post of Junior Technical Associate (JTA) (Signal/Telecommunication), Technician (Signal/Telecommunication) in Konkan Railway Corporation Limited (KRCL). Candidates are advised to read the details, and eligibility criteria mentioned below for this vacancy. Candidates must check their eligibility i.e. educational qualification, age limit, experience and etc. The eligible candidates can submit their application directly before 7th August 2025. Candidates can check the latest Konkan Railway Corporation Limited (KRCL) Recruitment 2025 Junior Technical Associate (JTA) (Signal/Telecommunication), Technician (Signal/Telecommunication) Vacancy 2025 details and apply online at the konkanrailway.com recruitment 2025 page.

Konkan Railway Corporation Limited (KRCL) Recruitment Notification & Recruitment application form is available @ konkanrailway.com. Konkan Railway Corporation Limited (KRCL). selection will be done on the basis of test/interview and shortlisted candidates will be appointed at Jammu & Kashmir. More details of konkanrailway.com recruitment, new vacancy, upcoming notices, syllabus, answer key, merit list, selection list, admit card, result, upcoming notifications and etc. will be uploaded on official website .

Junior Technical Associate (JTA) (Signal/Telecommunication), Technician (Signal/Telecommunication)

Job Location:
Post Granmorh, Reasi, 182311 Jammu & Kashmir
Last Date: 7th August 2025
Employment Type: Full-time

Number of Vacancy: 28 Posts

Educational Qualification:
Junior Technical Associate (JTA) (Signal/Telecommunication): Three years Diploma in Electrical/Electronics/ Information Technology / Communication Engineering / Computer Science & Engineering / Computer Science or Computer Engineering from a recognized University/institute or higher qualification.

Technician (Signal/Telecommunication): Matriculation / SSLC plus ITI from recognized institutions of NCVT/SCVT in the trade of Electrical/Electronic OR Bachelor Degree of Science in Physics / Electronics / Computer Science / Information Technology / Instrumentation from a recognized University/Institute OR B.SC in a Combination of Any Sub-Stream of basic stream of Physics / Electronics / Computer Science/Information Technology/Instrumentation from a recognized University/ Institute OR Degree/Diploma in Engineering in the above Basic Streams or in combination of any of above basic stream.

Pay Scale:
INR
37500-43380
/- Per Month

Age Limit: Maximum 30 Years.

Selection Procedure: please refer to official notification.

Application Fee: please refer to official notification.

How to Apply:

Date, time and place of walk-in interview: mentioned below -
Registration Time: 09.00 hrs to 12:00 hrs only on the date of walk-in-interview.
Date of walk-in-interview: 05.08.2025 and 07.08.2025.
Venue of Interview: USBRL Project Office, Konkan Railway Corporation Limited, Jyotipuram Road, Trintha, Post Granmorh Reasi, Jammu, Jammu & Kashmir (U.T). PIN-182311.

Important Dates:

Published on: 23rd July 2025

Last date for application is: 7th August 2025

For more details, please refer to official notification at

Active Recruitments

Job Name Location Last Date Details
Assistant Engineer ( 01 Posts)
INR67140-76660
Seawoods (West), Navi Mumbai 6th January 2026 View Details
Firstpreviousnext

Past/Expired Recruitments

Job Details Closing Date
Junior Technical Assistant and Various Posts
( 04 Posts) Posts • CBD Belapur, Navi Mumbai
12th December 2025
Technician
( 27 Posts) Posts • Seawoods (West), Navi Mumbai
26th September 2025
Assistant Engineer and Various Posts
( 16 Posts) Posts • CBD Belapur, Navi Mumbai
30th September 2025
Senior Project Manager (S&T)
( 05 Posts) Posts • CBD Belapur, Navi Mumbai
25th September 2025
Technical Assistant, Assistant Electrical Engineer
( 80 Posts) Posts • CBD Belapur, Navi Mumbai
18th September 2025
Design Engineer and Various Posts
( 13 Posts) Posts • 7-Tolstoy Marg, New Delhi
21st August 2025
Deputy Chief Electrical Engineer
( 02 Posts) Posts • CBD Belapur, Navi Mumbai
9th August 2025
Junior Technical Associate (JTA) (Signal/Telecommunication), Technician (Signal/Telecommunication)
( 28 Posts) Posts • Post Granmorh, Reasi
7th August 2025
Senior Regional Mechanical Engineer
( 01 Posts) Posts • Margao, South Goa
21st June 2025
Chief Personnel Officer (CPO)
( 01 Posts) Posts • CBD Belapur, Navi Mumbai
20th March 2025
Deputy Chief Electrical Engineer
( 01 Posts) Posts • CBD Belapur, Navi Mumbai
5th February 2025
Have a question? Ask the community!
Ask Now

About Konkan Railway Corporation Limited

Konkan Railway Corporation Limited Logo

The Konkan Railway was the missing link between India’s commercial capital, Mumbai, and Mangalore. The 741-kilometre line connects Maharashtra, Goa and Karnataka States — a region of criss-crossing rivers, plunging valleys and mountains that soar into the clouds.

The Konkan is a coastal strip of land bounded by the Sahyadri hills on the east, and Arabian Sea on the west. It is a land where mythology breathes side by side with economic growth,a land with rich mineral resources, dense forest cover and a landscape fringed with paddy, coconut and mango trees. The formidable terrain to be conquered and the short construction period meant that the project could only be completed with the help of several technological innovations. Apart from setting a trend for other infrastructure projects in the country, the Konkan Railway provides concrete proof of the skills of Indian engineers, their discipline, team spirit and courage. But it is also a tribute to the unconquerable human spirit. Beyond the technical jargon, it was a leap of faith that made the long cherished dream of the people of the region possible.

The Konkan Railway has also in a way changed the lives of the Engineers and otherpeople associated with the project. For them it was the glory of overcoming all odds, and the satisfaction and pride that they have built something for posterity.

The completion of the Konkan Railway was a “tryst with destiny” for many people in the Konkan region, redeemed in the 50th year of the nation’s Independence. It is hence entirely fitting that the first train on the completed track was flagged off on January 26, 1998, Republic Day.


Official Address
Konkan Railway Corporation Limited Belapur Bhavan, Plot No 6,Sector 11, CBD Belapur, Navi Mumbai – 400614
Mumbai, Maharashtra - 400614
Contact Information