Vacancy Circular No: 04/2024
NTPC Sail Power Company Private Limited (NSPCL) Technical Assistant Recruitment 2025 Advertisement for the post of Technical Assistant in NTPC Sail Power Company Private Limited (NSPCL). Candidates are advised to read the details, and eligibility criteria mentioned below for this vacancy. Candidates must check their eligibility i.e. educational qualification, age limit, experience and etc. The eligible candidates can submit their application directly before 31st January 2025. Candidates can check the latest NTPC Sail Power Company Private Limited (NSPCL) Recruitment 2025 Technical Assistant Vacancy 2025 details and apply online at the www.nspcl.co.in recruitment 2025 page.
NTPC Sail Power Company Private Limited (NSPCL) Recruitment Notification & Recruitment application form is available @ www.nspcl.co.in. NTPC Sail Power Company Private Limited (NSPCL). selection will be done on the basis of test/interview and shortlisted candidates will be appointed at Delhi. More details of www.nspcl.co.in recruitment, new vacancy, upcoming notices, syllabus, answer key, merit list, selection list, admit card, result, upcoming notifications and etc. will be uploaded on official website .
Number of Vacancy: 33 Posts
Educational Qualification:
Technical Assistant (Power Station- Electrical): Candidates Should have Full time regular Diploma in Electrical/ Electrical & Electronics Engineering with minimum 60% marks.
Technical Assistant (Power Station- Mechanical): Candidates Should have Full time regular Diploma in Mechanical / Production Engineering with minimum 60% marks.
Technical Assistant (Power Station- C&I): Candidates Should have Full time regular Diploma in Instrumentation/ Electronics Engineering with minimum 60 % marks.
Technical Assistant (Power Station- Chemistry): Candidates Should have Full time regular B.Sc. in Chemistry with minimum 60% marks.
Pay Scale:
INR
60000/- Per Month
Age Limit: Maximum 30 Years.
Selection Procedure: The selection shall be based on 2 stages:
a. 1 stage: Computer Based Test (CBT) followed by 2 stage – Skill Test. st
b. 1 Stage - Written test in CBT mode- The CBT test shall consist of 120 question. 40 Questions will consist of MCQs from General Knowledge, English, Quantitative Aptitude, Reasoning and rest 80 questions shall be MCQs from trade / discipline specific questions. The qualifying marks for the written test are 40%.
c. Exam duration will be of 2 hours. Each correct answer will fetch 01 mark to the candidate and for each incorrect answer, 0.25 marks will be deducted from the overall score of the candidate, However, there will be no negative marking for the unanswered questions. nd d.
2 stage - Based on the performance in the written test, candidates shall be shortlisted discipline wise in order of merit, based on the call ratio of 1:5 for the skill test. However, 2nd stage skill test will only be qualifying in nature. The qualifying marks of skill test are 40%. e. The final merit list will be prepared based on the marks of CBT test of those candidates who qualify in the skill test.
Application Fee: Candidate belonging to General category is required to pay a non-refundable registration fee of Rs. 300/-. The candidates from SC/ST/PwBD/XSM category and female candidates need not pay the registration fee.
Applications for this job are to be filled online. Please follow the link is given below to apply (or visit the original job details page): https://www.nspcl.co.in/pages/careers
Published on: 16th January 2025
For more details, please refer to official notification at Download Official Notification
| Job Details | Closing Date |
|---|---|
|
Assistant Officer (Environment Management, Safety)
( 05 Posts) Posts • 15 Bhikaiji Cama Place, New Delhi
|
5th May 2025 |
|
Technical Assistant
( 33 Posts) Posts • 15 Bhikaiji Cama Place, New Delhi
|
31st January 2025 |
NTPC Ltd formed a joint venture with SAIL on 50:50 basis in March, 2001 in the name NTPC-SAIL Power Company Limited (NSPCL). NSPCL took over captive power plant-II located at Durgapur Steel Plant (2X60 MW) and Rourkela Steel Plant (2X60 MW) from SAIL.
NTPC Ltd formed another joint venture company with SAIL on 50:50 basis in March, 2002 in the name of Bhilai Electric Supply Company (P) Ltd. (BESCL). BESCL took over captive power plant-II located at Bhilai Steel Plant (2X30 MW + 1X14 MW BPTG) from SAIL. With effect from 11th September, 2006, BESCL was amalgamated with NSPCL and all properties, licenses, permissions, debt, liabilities etc. with respect to BESCL now rests in NSPCL.
NSPCL added 2x250 MW Thermal Power Plant at Bhilai which was commissioned in the year 2009. NSPCL further added 1x250 MW Captive Thermal Power Plant at Rourkela and 1x20 MW at Durgapur in the year 2022. Another 1x20 MW unit at Durgapur was commissioned in March'24
The total installed Capacity of NSPCL as on 29.03.2024 is 1104 MW. NSPCL has awarded its first Solar Project at Bhilai of 1x15 MW in Maroda Reservoir-1 in May’2024. The project is under construction.