Vacancy Circular No: 01/2025
NTPC Sail Power Company Private Limited (NSPCL) Assistant Officer (Environment Management, Safety) Recruitment 2025. Advertisement for the post of Assistant Officer (Environment Management, Safety) in NTPC Sail Power Company Private Limited (NSPCL). Candidates are advised to read the details, and eligibility criteria mentioned below for this vacancy. Candidates must check their eligibility i.e. educational qualification, age limit, experience and etc. The eligible candidates can submit their application directly before 5th May 2025. Candidates can check the latest NTPC Sail Power Company Private Limited (NSPCL) Recruitment 2025 Assistant Officer (Environment Management, Safety) Vacancy 2025 details and apply online at the www.nspcl.co.in recruitment 2025 page.
NTPC Sail Power Company Private Limited (NSPCL) Recruitment Notification & Recruitment application form is available @ www.nspcl.co.in. NTPC Sail Power Company Private Limited (NSPCL). selection will be done on the basis of test/interview and shortlisted candidates will be appointed at Delhi. More details of www.nspcl.co.in recruitment, new vacancy, upcoming notices, syllabus, answer key, merit list, selection list, admit card, result, upcoming notifications and etc. will be uploaded on official website .
Number of Vacancy: 05 Posts
Educational Qualification:
Assistant Officer (Environment Management): Graduate Engineering Degree in Environment with at least 60% marks OR Graduate with at least 60% marks with Full Time PG Degree / PG Diploma / M.Sc. /M.Tech. in Environment Engineering / Environment Science / Environment Management with at least 60% marks from a recognized University / Institution.
Assistant Officer (Safety): Full time Engineering degree in Mechanical / Electrical / Electronics/ Civil / Production / Chemical/ Construction/ Instrumentation from recognized University /Institute with not less than 60% marks, with Diploma / Advance Diploma / PG Diploma in Industrial Safety from Central Labour Institute / Regional Labour Institute , Govt. of India.
Pay Scale:
INR
30000-120000/- Per Month
Age Limit: Maximum 45 Years.
Selection Procedure: Eligible candidates will have to appear for All India based Online Selection Test. The online selection test will have two parts i.e Subject Knowledge Test(SKT) & Executive Aptitude Test (EAT). The candidates are required to qualify both in Subject Knowledge Test(SKT) and Executive Aptitude Test (EAT), separately. Based on merit and requirement of the post, candidates will be short listed for Personal Interview. All shortlisted candidates after the test, will have to secure minimum qualifying marks in Interview, as applicable. The final selection will be based on 85% weightage of online selection test and 15% weightage of interview marks.
Application Fee: Candidate belonging to General category is required to pay a non-refundable registration fee of Rs. 300/-. The candidates from SC/ST/PwBD/XSM category and female candidates need not pay the registration fee.
Applications for this job are to be filled online. Please follow the link is given below to apply (or visit the original job details page): https://www.nspcl.co.in/pages/careers.
Published on: 19th April 2025
For more details, please refer to official notification at Download Official Notification
| Job Details | Closing Date |
|---|---|
|
Assistant Officer (Environment Management, Safety)
( 05 Posts) Posts • 15 Bhikaiji Cama Place, New Delhi
|
5th May 2025 |
|
Technical Assistant
( 33 Posts) Posts • 15 Bhikaiji Cama Place, New Delhi
|
31st January 2025 |
NTPC Ltd formed a joint venture with SAIL on 50:50 basis in March, 2001 in the name NTPC-SAIL Power Company Limited (NSPCL). NSPCL took over captive power plant-II located at Durgapur Steel Plant (2X60 MW) and Rourkela Steel Plant (2X60 MW) from SAIL.
NTPC Ltd formed another joint venture company with SAIL on 50:50 basis in March, 2002 in the name of Bhilai Electric Supply Company (P) Ltd. (BESCL). BESCL took over captive power plant-II located at Bhilai Steel Plant (2X30 MW + 1X14 MW BPTG) from SAIL. With effect from 11th September, 2006, BESCL was amalgamated with NSPCL and all properties, licenses, permissions, debt, liabilities etc. with respect to BESCL now rests in NSPCL.
NSPCL added 2x250 MW Thermal Power Plant at Bhilai which was commissioned in the year 2009. NSPCL further added 1x250 MW Captive Thermal Power Plant at Rourkela and 1x20 MW at Durgapur in the year 2022. Another 1x20 MW unit at Durgapur was commissioned in March'24
The total installed Capacity of NSPCL as on 29.03.2024 is 1104 MW. NSPCL has awarded its first Solar Project at Bhilai of 1x15 MW in Maroda Reservoir-1 in May’2024. The project is under construction.