Vacancy Circular No:
Konkan Railway Corporation Limited (KRCL)
invites applications for recruitment of Station Master
-, Mangalore, Raigarh, - Karnataka, Chhattisgarh
Number of Vacancy: 3 Posts
| Konkan Railway Vacancy 2022 Recruitment 2022 | Details |
|---|---|
| Job Role | Station Master |
| Education Requirement | N,A |
| Total Vacancy | 3 Posts |
| Job Locations | Mangalore, Raigarh |
| Age Limit | Upper age limit: Upto 63 years |
| Experience | 10 - 15 years |
| Salary | Not Disclosed |
| Posted on | 17 Jan, 2022 |
| Last Date To Apply | 28 Jan, 2022 |
Educational Qualification: N/A
Experience: Please refer to official document
The Corporation invites applications from retired Station Masters for appointment on Reemployment basis for the period of 01 years against the post of Station Master in Operating department on Konkan Railway Route as per the details indicated below: 1. Category: Station Master on Re-employment Basis 2. Payscale: 7th CPC Pay Matrix Level-06. 3. No. of post: 03 4. Experience: Cumulative working experience of ten (10) years as Station Master in Railways/Konkan Railway Corp. Ltd. 5. Location Konkan Railway Route (KOLAD TO THOKUR) 6. Remuneration 7th CPC Pay Matrix Level-6. (As per 6th CPC, PB-2, Rs.9300-34800 with GP Rs.4200/-). However, pay and allowance will be governed as per the Railway Board Guideline issued from time to time (i.e. last month basic minus pension). Allowances are applicable on the last basic pay without deducting pension. 7. Minimum eligibility criteria Worked in Scale in 7th CPC Pay Matrix Level -6 (Regular) for not less than 10 years in the grade in Indian Railway/Konkan Railway Corporation Ltd. (KRCL) OR Station Master who will retire on or before 31/01/2022 from Indian Railways /Konkan Railway Corporation Ltd. ( KRCL). 8. Details of job description Working of trains as per the procedure prescribed in General & Subsidiary Rules, Block Working Manual, Accident Manual, etc. Updation of registers, books, files, etc., pertaining to train operations. All Commercial/Operational duties are entrusted from time to time. General supervision and proper upkeep of station building/ premises and amenities. Ensuring cleanliness of stations. Maintaining coordination with other departments so as to ensure efficient train operation. Any other work assigned by administration from time to time.
Pay Scale:
INR
Not Disclosed
Age Limit: Upper age limit: Upto 63 years
Selection Will be Based either Written Exam/Interview
1. Candidates should ensure that they see the instructions, eligibility, and other details of the notification on www.konkanrailway.com under the link Departments - > Human Resources - > Recruitment - > Notification. Applications in the prescribed format as given on the above link and completed in all respects along with enclosures and clearly mentioning the above Notification No. and Post applied for should reach to Deputy Chief Personnel Officer/HQ on email id: [email protected] on or before 28/01/2022 by 17:30 hrs
2. Application complete in all respect along with all enclosures as mentioned above should be sent to Dy. Chief Personnel Officer/HQ on email id: [email protected] on or before 28/01/2022 by 17:30 hrs. Applications received after this date/time will not be entertained. Above Selection is subject to vigilance and D&AR clearance of candidate, if required. Candidates are warned that submission of false information will render them liable for immediate dismissal if selected without any notice or disciplinary action. Konkan Railway holds all the right to alter the number of vacancies and other procedures or cancel the recruitment against this notification as it may deem fit without citing any reason. No correspondence will be entertained from or on behalf of ineligible candidates. CO-13032/15/2018-PERS[28281]
Published on: 17 January 2022
For more details, please refer to official notification at Download Official Notification
| Job Details | Closing Date |
|---|---|
|
Assistant Engineer
( 01 Posts) Posts • Seawoods (West), Navi Mumbai
|
6th January 2026 |
|
Junior Technical Assistant and Various Posts
( 04 Posts) Posts • CBD Belapur, Navi Mumbai
|
12th December 2025 |
|
Technician
( 27 Posts) Posts • Seawoods (West), Navi Mumbai
|
26th September 2025 |
|
Assistant Engineer and Various Posts
( 16 Posts) Posts • CBD Belapur, Navi Mumbai
|
30th September 2025 |
|
Senior Project Manager (S&T)
( 05 Posts) Posts • CBD Belapur, Navi Mumbai
|
25th September 2025 |
|
Technical Assistant, Assistant Electrical Engineer
( 80 Posts) Posts • CBD Belapur, Navi Mumbai
|
18th September 2025 |
|
Design Engineer and Various Posts
( 13 Posts) Posts • 7-Tolstoy Marg, New Delhi
|
21st August 2025 |
|
Deputy Chief Electrical Engineer
( 02 Posts) Posts • CBD Belapur, Navi Mumbai
|
9th August 2025 |
|
Junior Technical Associate (JTA) (Signal/Telecommunication), Technician (Signal/Telecommunication)
( 28 Posts) Posts • Post Granmorh, Reasi
|
7th August 2025 |
|
Senior Regional Mechanical Engineer
( 01 Posts) Posts • Margao, South Goa
|
21st June 2025 |
|
Chief Personnel Officer (CPO)
( 01 Posts) Posts • CBD Belapur, Navi Mumbai
|
20th March 2025 |
|
Deputy Chief Electrical Engineer
( 01 Posts) Posts • CBD Belapur, Navi Mumbai
|
5th February 2025 |
The Konkan Railway was the missing link between India’s commercial capital, Mumbai, and Mangalore. The 741-kilometre line connects Maharashtra, Goa and Karnataka States — a region of criss-crossing rivers, plunging valleys and mountains that soar into the clouds.
The Konkan is a coastal strip of land bounded by the Sahyadri hills on the east, and Arabian Sea on the west. It is a land where mythology breathes side by side with economic growth,a land with rich mineral resources, dense forest cover and a landscape fringed with paddy, coconut and mango trees. The formidable terrain to be conquered and the short construction period meant that the project could only be completed with the help of several technological innovations. Apart from setting a trend for other infrastructure projects in the country, the Konkan Railway provides concrete proof of the skills of Indian engineers, their discipline, team spirit and courage. But it is also a tribute to the unconquerable human spirit. Beyond the technical jargon, it was a leap of faith that made the long cherished dream of the people of the region possible.
The Konkan Railway has also in a way changed the lives of the Engineers and otherpeople associated with the project. For them it was the glory of overcoming all odds, and the satisfaction and pride that they have built something for posterity.
The completion of the Konkan Railway was a “tryst with destiny” for many people in the Konkan region, redeemed in the 50th year of the nation’s Independence. It is hence entirely fitting that the first train on the completed track was flagged off on January 26, 1998, Republic Day.