Vacancy Circular No:
Konkan Railway Corporation Limited
invites applications for recruitment of Chief Mechanical Engineer
Number of Vacancy: 1 Posts
| Konkan Railway Announced Job Notification For Chief Mechanical Engineer Vacancies - Apply Soon Recruitment 2022 | Details |
|---|---|
| Job Role | Chief Mechanical Engineer |
| Education Requirement | B.Tech, B.E |
| Total Vacancy | 1 Post |
| Job Locations | Navi Mumbai |
| Age Limit | Below 55 years as on the date of notification. |
| Experience | 15 - 20 years |
| Salary | Not Disclosed |
| Posted on | 22 Feb, 2022 |
| Last Date To Apply | 14 Mar, 2022 |
Educational Qualification: B.Tech/B.E
1. Post Name: Chief Mechanical Engineer/Project
2. NO of Post: One (1) post in SAG/SG on deputation
3. Location: Corporate Office, Belapur, Navi Mumbai.
4. Deputation and Term of Deputation: 3 years, normal term of deputation. Extendable upto five (05) years.
5. Scale Of Pay: SAG/SG As per 7th CPC Pay Matrix Level-14. Or As per 7th CPC Pay Matrix Level-13.
6. Pay and Allowancees: The officer will draw pay and allowances as per DOPT instructions. which would have been admissible to him/her from time to time on the Railways plus deputation (duty) allowance.
7. Eligibility:
a. IRSME Officer working in PML-14 of 7th CPC or Mechanical Engineer Executives working in other PSU in IDA scale E8 (Rs.1,20,000-2,80,000) OR Officers of IRSME cadre of Indian Railways and working in PML-13 of 7th CPC with Mechanical Engineer Executives working in other PSU in IDA scale E6 (Rs.90,000- 2,40,000) with 15 years experience
b. 15 years experience or Minimum working experience of 15 years of service in Group A in Indian Railways/other Govt. Deptt / PsU.
c. He will liaison with Zonal Railways in Operations and Projects related activities. He will look after Rolling Stock Infrastructure, related projects and activities of Mechanical Department reporting to CME KRCL 0&M and Technology
8. VACANCY NOTICE NO. DE/01/2022
Pay Scale:
INR
Not Disclosed
Age Limit: Below 55 years as on the date of notification.
1. Eligible suitable applicants will be short-listed on the basis of eligibility and experience, if required, as per Vacancy Notice.
2. Term of Appointment : Deputation
1. Closing Date: 21 days from date of issue of notification.
2. Web Address: www.konkanrailway.com
3. Applicants are requested to submit simultaneously a copy of the application to their Administrative office (HQ/Board etc.) for forwarding the application to KRCL indicating No Objection, Vigilance/D&AR Clearance etc.
4. While forwarding their application, Administrative office i.e Zonal Railway,P.U, Rly Bd etc may please mention APAR ratings of the officer for last five years.
5. The officer may forward an advance copywith above enclosures on email id: [email protected] also on or before 14/03/2022 at 17:30 hrs.
6. Eligible and interested officer may apply in the prescribed application format, Annexure-A attached. Complete filled-in application may be sent to The Chief Personnel Officer, Konkan Railway Corporation Ltd., 4th floor, Belapur Bhavan, Plot No.6, sector-11, C.B.D Belapur, Navi Mumbai, PIN 400614.
Published on: 22 February 2022
For more details, please refer to official notification at Download Official Notification
| Job Details | Closing Date |
|---|---|
|
Assistant Engineer
( 01 Posts) Posts • Seawoods (West), Navi Mumbai
|
6th January 2026 |
|
Junior Technical Assistant and Various Posts
( 04 Posts) Posts • CBD Belapur, Navi Mumbai
|
12th December 2025 |
|
Technician
( 27 Posts) Posts • Seawoods (West), Navi Mumbai
|
26th September 2025 |
|
Assistant Engineer and Various Posts
( 16 Posts) Posts • CBD Belapur, Navi Mumbai
|
30th September 2025 |
|
Senior Project Manager (S&T)
( 05 Posts) Posts • CBD Belapur, Navi Mumbai
|
25th September 2025 |
|
Technical Assistant, Assistant Electrical Engineer
( 80 Posts) Posts • CBD Belapur, Navi Mumbai
|
18th September 2025 |
|
Design Engineer and Various Posts
( 13 Posts) Posts • 7-Tolstoy Marg, New Delhi
|
21st August 2025 |
|
Deputy Chief Electrical Engineer
( 02 Posts) Posts • CBD Belapur, Navi Mumbai
|
9th August 2025 |
|
Junior Technical Associate (JTA) (Signal/Telecommunication), Technician (Signal/Telecommunication)
( 28 Posts) Posts • Post Granmorh, Reasi
|
7th August 2025 |
|
Senior Regional Mechanical Engineer
( 01 Posts) Posts • Margao, South Goa
|
21st June 2025 |
|
Chief Personnel Officer (CPO)
( 01 Posts) Posts • CBD Belapur, Navi Mumbai
|
20th March 2025 |
|
Deputy Chief Electrical Engineer
( 01 Posts) Posts • CBD Belapur, Navi Mumbai
|
5th February 2025 |
The Konkan Railway was the missing link between India’s commercial capital, Mumbai, and Mangalore. The 741-kilometre line connects Maharashtra, Goa and Karnataka States — a region of criss-crossing rivers, plunging valleys and mountains that soar into the clouds.
The Konkan is a coastal strip of land bounded by the Sahyadri hills on the east, and Arabian Sea on the west. It is a land where mythology breathes side by side with economic growth,a land with rich mineral resources, dense forest cover and a landscape fringed with paddy, coconut and mango trees. The formidable terrain to be conquered and the short construction period meant that the project could only be completed with the help of several technological innovations. Apart from setting a trend for other infrastructure projects in the country, the Konkan Railway provides concrete proof of the skills of Indian engineers, their discipline, team spirit and courage. But it is also a tribute to the unconquerable human spirit. Beyond the technical jargon, it was a leap of faith that made the long cherished dream of the people of the region possible.
The Konkan Railway has also in a way changed the lives of the Engineers and otherpeople associated with the project. For them it was the glory of overcoming all odds, and the satisfaction and pride that they have built something for posterity.
The completion of the Konkan Railway was a “tryst with destiny” for many people in the Konkan region, redeemed in the 50th year of the nation’s Independence. It is hence entirely fitting that the first train on the completed track was flagged off on January 26, 1998, Republic Day.