Vacancy Circular No: -
Konkan Railway Corporation Limited (KRCL) Executive Director/Project Recruitment 2024
Advertisement for the post of Executive Director/Project in Konkan Railway Corporation Limited (KRCL). Candidates are advised to read the details, and eligibility criteria mentioned below for this vacancy. Candidates must check their eligibility i.e. educational qualification, age limit, experience and etc. The eligible candidates can submit their application directly before 9th May 2024. Candidates can check the latest Konkan Railway Corporation Limited (KRCL) Recruitment 2024 Executive Director/Project Vacancy 2024 details and apply online at the konkanrailway.com recruitment 2024 page.
Konkan Railway Corporation Limited (KRCL) Recruitment Notification & Recruitment application form is available @ konkanrailway.com. Konkan Railway Corporation Limited (KRCL) selection will be done on the basis of test/interview and shortlisted candidates will be appointed at Maharashtra. More details of konkanrailway.com recruitment, new vacancy, upcoming notices, syllabus, answer key, merit list, selection list, admit card, result, upcoming notifications and etc. will be uploaded on official website .
Number of Vacancy: 01 Posts
Educational Qualification:
i) Candidates must possess a Bachelor of Engineering (Civil) or its equivalent.
ii) Applicant should have work experience as an officer in Indian Railways/Indian Railway PSU with a minimum of 15 years of regular service in the Executive cadre and retired from SG and above grade.
iii) Should have more than 25 years of experience in civil engineering work.
Work Experience: Experience in alignment design, surveying, investigation, preparation of detailed project reports, preliminary engineering cum traffic survey, coordination with designers and proof checkers, planning, estimation, BOQ, execution of works, preparation of tender documents, invitation of tenders, and the like.
Pay Scale:
INR
Level-13 Per Month
Age Limit: Maximum 62 Years.
Application Fee: please refer to official notification.
Selection Procedure: please refer to official notification.
complete in all respects along with enclosures, clearly mentioning the above Notification No. and Post applied for should reach to Deputy Chief Personnel Officer/Project & IT on email id: [email protected] on or before 09/05/2024 by 17:30 hrs.
Published on: 29th April 2024
For more details, please refer to official notification at Download Official Notification
| Job Details | Closing Date |
|---|---|
|
Assistant Engineer
( 01 Posts) Posts • Seawoods (West), Navi Mumbai
|
6th January 2026 |
|
Junior Technical Assistant and Various Posts
( 04 Posts) Posts • CBD Belapur, Navi Mumbai
|
12th December 2025 |
|
Technician
( 27 Posts) Posts • Seawoods (West), Navi Mumbai
|
26th September 2025 |
|
Assistant Engineer and Various Posts
( 16 Posts) Posts • CBD Belapur, Navi Mumbai
|
30th September 2025 |
|
Senior Project Manager (S&T)
( 05 Posts) Posts • CBD Belapur, Navi Mumbai
|
25th September 2025 |
|
Technical Assistant, Assistant Electrical Engineer
( 80 Posts) Posts • CBD Belapur, Navi Mumbai
|
18th September 2025 |
|
Design Engineer and Various Posts
( 13 Posts) Posts • 7-Tolstoy Marg, New Delhi
|
21st August 2025 |
|
Deputy Chief Electrical Engineer
( 02 Posts) Posts • CBD Belapur, Navi Mumbai
|
9th August 2025 |
|
Junior Technical Associate (JTA) (Signal/Telecommunication), Technician (Signal/Telecommunication)
( 28 Posts) Posts • Post Granmorh, Reasi
|
7th August 2025 |
|
Senior Regional Mechanical Engineer
( 01 Posts) Posts • Margao, South Goa
|
21st June 2025 |
|
Chief Personnel Officer (CPO)
( 01 Posts) Posts • CBD Belapur, Navi Mumbai
|
20th March 2025 |
|
Deputy Chief Electrical Engineer
( 01 Posts) Posts • CBD Belapur, Navi Mumbai
|
5th February 2025 |
The Konkan Railway was the missing link between India’s commercial capital, Mumbai, and Mangalore. The 741-kilometre line connects Maharashtra, Goa and Karnataka States — a region of criss-crossing rivers, plunging valleys and mountains that soar into the clouds.
The Konkan is a coastal strip of land bounded by the Sahyadri hills on the east, and Arabian Sea on the west. It is a land where mythology breathes side by side with economic growth,a land with rich mineral resources, dense forest cover and a landscape fringed with paddy, coconut and mango trees. The formidable terrain to be conquered and the short construction period meant that the project could only be completed with the help of several technological innovations. Apart from setting a trend for other infrastructure projects in the country, the Konkan Railway provides concrete proof of the skills of Indian engineers, their discipline, team spirit and courage. But it is also a tribute to the unconquerable human spirit. Beyond the technical jargon, it was a leap of faith that made the long cherished dream of the people of the region possible.
The Konkan Railway has also in a way changed the lives of the Engineers and otherpeople associated with the project. For them it was the glory of overcoming all odds, and the satisfaction and pride that they have built something for posterity.
The completion of the Konkan Railway was a “tryst with destiny” for many people in the Konkan region, redeemed in the 50th year of the nation’s Independence. It is hence entirely fitting that the first train on the completed track was flagged off on January 26, 1998, Republic Day.