KRCL Recruitment 2026 for 8 Junior Technical Assistant – Walk-in Interview @ konkanrailway.com
Konkan Railway Corporation Limited (KRCL) has released the official notification for Junior Technical Assistant recruitment on 12 August 2026. This is a golden opportunity for candidates with a Degree or Diploma in Civil Engineering to secure a government job in the railway sector. A total of 8 vacancies are available. The walk-in interview will be held on 25 August 2026. Read the full article to get the official notification PDF, eligibility details, salary, and step-by-step application process.
| Organization | Konkan Railway Corporation Limited (KRCL) |
|---|---|
| Post Name | Junior Technical Assistant |
| Total Vacancies | 8 |
| Last Date (Walk-in) | 25 August 2026 |
| Official Website | www.konkanrailway.com |
| Apply Mode | Walk-in |
| Post Designation | Vacancy Count | Salary (INR per month) |
|---|---|---|
| Junior Technical Assistant | 3 | 41,380 – 47,220 |
| Junior Technical Assistant / Design & Drawing | 5 | 41,380 – 47,220 |
| Total | 8 |
Advertisement No: CO/P-R/13C/2026
Maximum 35 years as on 1 July 2026. Age relaxation: 5 years for SC candidates.
Use our Age Calculator to check eligibility.
The selection will be based on:
Since this is a walk-in recruitment, no online application is required. Follow these steps:
| Event | Date |
|---|---|
| Notification Release | 12 August 2026 |
| Age Cut-off Date | 1 July 2026 |
| Walk-in Interview | 25 August 2026 |
The walk-in interview is scheduled on 25 August 2026. Candidates must report on that date with all documents.
The consolidated remuneration is Rs. 41,380 – 47,220 per month, depending on the city class.
Maximum 35 years as on 1 July 2026. SC candidates get 5 years relaxation.
Total 8 vacancies: 3 for Junior Technical Assistant and 5 for Junior Technical Assistant / Design & Drawing.
Full-time Degree or Diploma in Civil Engineering from an AICTE-approved institute. Additional experience in railway projects is required.
Yes, SC candidates receive 5 years relaxation. No relaxation for other categories as per notification.
Selection is based on a walk-in interview, preliminary screening, and a merit list. No written exam.
Download the official PDF from the link provided in this article: Click here.
For more Sarkari Naukri updates, visit MySarkariNaukri.com. Subscribe to our job alerts to never miss a government job opportunity.
| Job Name | Location | Last Date | Details |
|---|---|---|---|
|
KRCL Recruitment 2026 for 8 Junior Technical Assistant – Walk-in Interview @ konkanrailway.com
|
Navi Mumbai | 25th August, 2026 | View Details |
|
Konkan Railway Corporation Limited (KRCL) Invites Application for 134 Apprentice Trainee Recruitment 2026
|
Navi Mumbai | 28th August, 2026 | View Details |
|
KRCL Recruitment 2026 for 201 Junior Engineer, ALP, Track Maintainer & Other Posts – Apply Online @ konkanrailway.com
|
Raigad | 31st August, 2026 | View Details |
| Job Details | Closing Date |
|---|---|
|
Assistant Engineer
( 01 Posts) Posts • Seawoods (West), Navi Mumbai
|
6th January 2026 |
|
Junior Technical Assistant and Various Posts
( 04 Posts) Posts • CBD Belapur, Navi Mumbai
|
12th December 2025 |
|
Technician
( 27 Posts) Posts • Seawoods (West), Navi Mumbai
|
26th September 2025 |
|
Assistant Engineer and Various Posts
( 16 Posts) Posts • CBD Belapur, Navi Mumbai
|
30th September 2025 |
|
Senior Project Manager (S&T)
( 05 Posts) Posts • CBD Belapur, Navi Mumbai
|
25th September 2025 |
|
Technical Assistant, Assistant Electrical Engineer
( 80 Posts) Posts • CBD Belapur, Navi Mumbai
|
18th September 2025 |
|
Design Engineer and Various Posts
( 13 Posts) Posts • 7-Tolstoy Marg, New Delhi
|
21st August 2025 |
The Konkan Railway was the missing link between India’s commercial capital, Mumbai, and Mangalore. The 741-kilometre line connects Maharashtra, Goa and Karnataka States — a region of criss-crossing rivers, plunging valleys and mountains that soar into the clouds.
The Konkan is a coastal strip of land bounded by the Sahyadri hills on the east, and Arabian Sea on the west. It is a land where mythology breathes side by side with economic growth,a land with rich mineral resources, dense forest cover and a landscape fringed with paddy, coconut and mango trees. The formidable terrain to be conquered and the short construction period meant that the project could only be completed with the help of several technological innovations. Apart from setting a trend for other infrastructure projects in the country, the Konkan Railway provides concrete proof of the skills of Indian engineers, their discipline, team spirit and courage. But it is also a tribute to the unconquerable human spirit. Beyond the technical jargon, it was a leap of faith that made the long cherished dream of the people of the region possible.
The Konkan Railway has also in a way changed the lives of the Engineers and otherpeople associated with the project. For them it was the glory of overcoming all odds, and the satisfaction and pride that they have built something for posterity.
The completion of the Konkan Railway was a “tryst with destiny” for many people in the Konkan region, redeemed in the 50th year of the nation’s Independence. It is hence entirely fitting that the first train on the completed track was flagged off on January 26, 1998, Republic Day.